Nov 13th, 2019
ATHENS, Greece – Energean plans a 5.4-km (3.36-mi) subsea tieback of its recent Karish North discovery offshore Israel to the FPSO Energean Power.
This follows completion of side track appraisal operations at the well, which have confirmed a best estimate recoverable resource of 0.9 tcf of gas and 34 MMbbl of light oil/condensate (combined around 190 MMboe).
The Energean Power is being constructed with a gas production capacity of 8 bcm/yr (775 MMcf/d).
The drillship Stena DrillMAX has now relocated to complete the three Karish Main development wells, after which the vessel will drill the Zeus exploration prospect, targeting 0.6 tcf across three reservoir intervals.
