August 2, 2016
The Egyptian Natural Gas Company (GASCO) could potentially hire domestic energy companies such as Enppi and Petrojet to provide technical support as well as engineering and design services to transport gas from the Raven field in the North Alexandria Concession to the Western Desert Gas Complex, an unnamed source told Al Mal.
Natural gas would be transported from the BP-operated field at a rate ranging between 400 and 450 mcf/d, with the project expected to be completed between two and three years. Last week, it was reported that GASCO is also studying investing USD 500 mn in the second phase of the project to increase the production of the ethane-propane mix from the complex.
Showing posts with label Western Desert Gas Complex (WDGC). Show all posts
Showing posts with label Western Desert Gas Complex (WDGC). Show all posts
Tuesday, August 2, 2016
Saturday, February 20, 2016
MOU signed between GASCO and Tecnicas Reunidas for enhanced methane recovery project study - ENERGY EGYPT / MINISTRY OF PETROLEUM
February 20, 2016
Eng. Tarek El-Molla, Minister of Petroleum and Mineral Resources, and Mr. Arturo Avello, the Spanish Ambassador in Cairo, witnessed the signing of a Memorandum of Understanding between the Egyptian Natural Gas Company (GASCO) and Spanish company Tecnicas Reunidas, one of the largest international companies specializing in engineering design and construction of oil and gas projects.
The MOU is for the preparation of a technical and economic feasibility study and the provision of finance offers for the second phase of the enhanced methane recovery project at the Western Desert Gas Complex (WDGC). The project aims to maximize the production of ethane/propane mixture, which forms the basis for the production of ethylene and polyethylene in the petrochemical industry, thus contributing to securing feedstock and raw material for new and existing petrochemical projects.
The Memorandum was signed by Eng. Karem Mahmoud, Chairman of GASCO and Mr. Ricardo Sanchez Galindo, Commercial Director of Tecnicas Reunidas. The signing took place in the presence of Eng. Mohamed Taher, First Undersecretary of the Ministry of Petroleum for Petroleum Affairs, Eng. Khaled Abdel Badie, Head of Egyptian Natural Gas Holding Company (EGAS), and Eng. Mohamed Safaan, President and Chairman of Egyptian Petrochemicals Holding Company (ECHEM).
Eng. Tarek El-Molla, Minister of Petroleum and Mineral Resources, and Mr. Arturo Avello, the Spanish Ambassador in Cairo, witnessed the signing of a Memorandum of Understanding between the Egyptian Natural Gas Company (GASCO) and Spanish company Tecnicas Reunidas, one of the largest international companies specializing in engineering design and construction of oil and gas projects.
The MOU is for the preparation of a technical and economic feasibility study and the provision of finance offers for the second phase of the enhanced methane recovery project at the Western Desert Gas Complex (WDGC). The project aims to maximize the production of ethane/propane mixture, which forms the basis for the production of ethylene and polyethylene in the petrochemical industry, thus contributing to securing feedstock and raw material for new and existing petrochemical projects.
The Memorandum was signed by Eng. Karem Mahmoud, Chairman of GASCO and Mr. Ricardo Sanchez Galindo, Commercial Director of Tecnicas Reunidas. The signing took place in the presence of Eng. Mohamed Taher, First Undersecretary of the Ministry of Petroleum for Petroleum Affairs, Eng. Khaled Abdel Badie, Head of Egyptian Natural Gas Holding Company (EGAS), and Eng. Mohamed Safaan, President and Chairman of Egyptian Petrochemicals Holding Company (ECHEM).
Subscribe to:
Posts (Atom)

