FEB/21/2018
HOUSTON -- Schlumberger today announced the award by Noble Energy of an engineering and supply contract for a 2,000-ton single-lift process module to be installed on the Leviathan platform in the Eastern Mediterranean.
The scope of the contract includes pre-treatment, salt removal and regeneration of monoethylene glycol (MEG) for re-injection in the subsea flowlines for hydrate inhibition. The Schlumberger PUREMEG reclamation and regeneration system is a proprietary technology that will be supplied as a single-lift module for installation on the production platform.
