Showing posts with label Abu Qir Port. Show all posts
Showing posts with label Abu Qir Port. Show all posts

Sunday, November 19, 2017

Fugro deploys vessel for coring at Zohr - ENTERPRISE / OFFSHORE MAGAZINE

Sunday, 19 November 2017

Geotechnical and survey services provider Fugro is sending its vessel MV Kobi Ruegg on it first project in the Egyptian sector of the Mediterranean, Offshore Magazine reports

“The three-year-old, 58-m (190-ft) long vessel, contracted by Saipem, will deploy a large diameter piston core system to obtain soil samples from the ultra-deepwater Zohr gas field. 

Its next assignments will be geophysical surveys for Pico and Shell… From its new home port of Abu Qir, it will undertake marine site characterization services for Fugro’s clients in the Eastern Mediterranean and Red Sea.” 

The values of the contracts were not disclosed.

Wednesday, June 21, 2017

EGL & KADMAR make its mark on Zohr, the biggest Mediterranean gas discovery - ENERGY EGYPT

June 21, 2017

Egyptian Global Logistics EGL subsidiary of KADMAR Group succeeded in handling the kick off for Egypt Mega Gas Project using the fleet of extendable trailers handling joint of 28 meters length & weighting 40 tons for Saipem project Zohr; the biggest gas discovery in Egyptian waters in the Mediterranean.

EGL completed the port handling from gearless vessel at Alexandria Port in Egypt followed by trucking to storage area and reload to the Saipem base at Abu Qir Port for shipping to the Zohr offshore located 120 miles North East Port Said.

Wednesday, February 22, 2017

EGL transports SAIPEM cargo to Zohr - BREAK BULK

FEBRUARY 22, 2017

Heavy transport firm Egyptian Global Logistics has delivered outsized components for the Zohr gas project via the port of Alexandria on the West Verge of the Nile Delta.

The firm transported cargo weighing up to 40 tonnes and measuring up to 28 meters in length for EPC contractor Saipem’s operations in the Zohr gas field. The offshore gas field is located 120 miles north east of Port Said in Egypt.

The team from EGL handled logistics for the project, initially discharging from a gearless vessel at Alexandria Port before trucking to a storage area for reloading at the Saipem’s base at Abu Qir Port.