Showing posts with label Zohr-5 Well. Show all posts
Showing posts with label Zohr-5 Well. Show all posts

Thursday, September 1, 2016

Eni successfully drilled and tested Zohr 5x - ENI

Eni successfully drilled Zohr 5x, the fifth well on Zohr structure, which confirmed the potential of the field at 30 Tcf OGIP.

01/09/2016 14:30

San Donato Milanese, 1st September 2016. Eni informs that Zohr 5x, the fifth well on Zohr structure has been successfully drilled to the final TD of 14,271 ft (4,350 m). The Zohr 5x well is located in 1,538 m of water depth and 12 Km south west from the discovery well Zohr 1x.

The well proved the presence of a carbonatic reservoir and gas accumulation also in the South-Western part of the Zohr mega-structure encountering about 590 ft (180 metres) of continuous hydrocarbon column in the carbonate sequence with excellent reservoir characteristics. The results are confirming the potential of the Zohr Field at 30 Tcf OGIP.

Monday, August 15, 2016

Eni invests $4bn in Zohr gas production processing plant - DAILY NEWS EGYPT

Italian oil company Eni invested $3.5-4bn in implementing the Zohr natural gas production processing plant at a capacity of 2.7bn cubic feet of gas per day. Minister of Petroleum and Mineral Resources Tarek El-Molla told Daily News Egypt that the total investments in Zohr field are estimated at $12bn until the point when production begins.

Mohamed Adel, August 15, 2016

Italian oil company Eni invested $3.5-4bn in implementing the Zohr natural gas production processing plant at a capacity of 2.7bn cubic feet of gas per day.

Minister of Petroleum and Mineral Resources Tarek El-Molla told Daily News Egypt that the total investments in Zohr field are estimated at $12bn until the point when production begins. Investments will then increase to $16bn over the life of the field.

Monday, July 11, 2016

Zohr gas reserves increase to 32tn cubic feet: EGAS - DAILY NEWS EGYPT

July 11, 2016, Mohamed Adel 
Indicators for the second well revealed larger reserves; six wells to be drilled in total at a cost of $100m each
The primary indicators of Zohr field’s second well, developed by Italian company Eni, show an increase in gas reserves owing to the discovery of a gas-carrying layer that is larger than that found in the first well.

These results indicate an increase in production to 250m cubic feet per day compared to the initial test results of 150m cubic feet in the concession area of Egypt’s territorial waters in the Mediterranean Sea.