20 December 2016
Abu Sennan, Egypt (RKH 22% working interest)
During the second half of 2016, both the Al Jahraa SE-1X exploration well and the ASH-1X ST2 development wells were brought onto production with additional zones in the wells to be brought into production at a later date.
A new development lease of c.30 square km was awarded around the Al Jahraa SE-1X well with EGPC attributing gross reserves of over 9 MMSTB to the development area.
Subject to Operating Committee approval, the Company expects two firm development wells to be drilled on the Al Jahraa field during the first half of 2017. These wells are aimed at maintaining production levels by offsetting natural decline from existing wells within the concession.
In addition, the Company imminently expects to receive final ratification for a 5-year extension to the Abu Sennan exploration licence. Once approved, the Company will undertake to participate in at least two exploration wells over the next 3 years at a commitment (net to Rockhopper's 22% working interest) of approximately $1.3 million.
Showing posts with label Al Jahra SE-1X Well. Show all posts
Showing posts with label Al Jahra SE-1X Well. Show all posts
Tuesday, December 20, 2016
Monday, September 5, 2016
Kuwait Energy starts production from Egypt's Al-Jahra SE-1X oil well - KUWAIT NEWS AGENCY (KUNA)
05/09/2016
By Osama Jalal
KUWAI, Sept 5 (KUNA) -- Kuwait Energy plc (Kuwait Energy) announced on Monday the commencement of production from the Al-Jahra SE-1X exploration well in the Abu Sennan concession located in Egypt's Western Desert.
After discovery of the well on 27 July 2016, Kuwait Energy obtained the development lease from the Egyptian Petroleum Corporation (EGPC) for Al-Jahra SE-1X on 24 August and commenced production a day later, at an initial rate of 460 barrels of oil per day (bopd).
The well is producing at a 2" inch choke size and production has stabilized to a daily average rate of 410 bopd, Sara Akbar, CEO of Kuwait Energy told KUNA.
By Osama Jalal
KUWAI, Sept 5 (KUNA) -- Kuwait Energy plc (Kuwait Energy) announced on Monday the commencement of production from the Al-Jahra SE-1X exploration well in the Abu Sennan concession located in Egypt's Western Desert.
After discovery of the well on 27 July 2016, Kuwait Energy obtained the development lease from the Egyptian Petroleum Corporation (EGPC) for Al-Jahra SE-1X on 24 August and commenced production a day later, at an initial rate of 460 barrels of oil per day (bopd).
The well is producing at a 2" inch choke size and production has stabilized to a daily average rate of 410 bopd, Sara Akbar, CEO of Kuwait Energy told KUNA.
Subscribe to:
Posts (Atom)

