Gas for transportation via the TANAP pipeline has already been contracted, President of Azerbaijan Ilham Aliyev told Sputnik.
The Trans-Anatolian Natural Gas Pipeline (TANAP) will not face competition from other regional energy projects as gas for transportation via the pipeline has already been contracted, President of Azerbaijan Ilham Aliyev told Sputnik.
"The volumes of gas that will be transported in the first stage along the entire length of the project, have already been contracted, they have already been sold. We have signed contracts for the increase in production, which will start in 2018 and should reach its peak in 2020-2021. Therefore, no other regional energy projects can compete with it, because we have already sold this gas," the president told Rossiya Segodnya International Information Agency’s Director General Dmitry Kiselev in an interview.
TANAP is a major part of the Southern Gas Corridor that will connect the Shah Deniz gas field in Azerbaijan with Europe. The corridor will run from Azerbaijan to Turkey, through Greece, Albania, and deep under the Adriatic Sea to southern Italy.
SOURCE
TANAP is a major part of the Southern Gas Corridor that will connect the Shah Deniz gas field in Azerbaijan with Europe. The corridor will run from Azerbaijan to Turkey, through Greece, Albania, and deep under the Adriatic Sea to southern Italy.
SOURCE