The 13th well of the Nooros gas field has come online, bringing an additional 90 mcf/d to the national grid. This would bring the field’s total production to 1.15 bcf/d, according to a report by Eni and EGPC JV Belayim Petroleum Company (Petrobel), Al Masry Al Youm reports.
The field’s 14th well is underway, which is expected to raise total production capacity to 1.2 bcf/d.
SOURCE
SOURCE