Italy’s Eni has linked the first well in its Baltim South West natural gas field to the national grid, an EGAS source said.
The well has a production capacity of 50 mcf/d and is the first of six wells, which will bring the field’s total production to 500 mcf/d once developed during the current fiscal year.
SOURCE
SOURCE